Sites & Capacity
Projected AI capacity (IT load)*
Active & in build (3)
| Image | Site | CapacityIT load Β· theoretical gross | Est. capacityend of year, IT load | Commentaries |
|---|---|---|---|---|
|
| β | ||
|
| Potential BTM Β· 500 MW gross | ||
|
| ERCOT: Base Load Β· 100 MW grossERCOT: Studied Load Β· 200 MW grossPotential BTM Β· 200 MW gross |
Pipeline portfolio (announced) (8)
Site | Planned capacity | Est. capacityend of year, IT load | Commentaries | |
|---|---|---|---|---|
| 70 MWgross | Q3 2027 |
| ERCOT: Fully Interconnection-Approved Β· 70 MW gross | |
| 200 MWgross | Q4 2027 |
| ERCOT: Fully Interconnection-Approved Β· 200 MW gross | |
| 1,000 MWgross | 2028 |
| ERCOT: Base Load Β· 1,000 MW gross | |
| 500 MWgross | 2028 |
| ERCOT: Studied Load Β· 500 MW gross | |
| 500 MWgross | 2028 |
| ERCOT: Studied Load Β· 500 MW gross | |
| 500 MWgross | 2028 |
| β | |
| 900 MWgross | 2030 |
| ERCOT: Studied Load Β· 900 MW grossPotential BTM Β· 900 MW gross | |
| 70 MWtheoretical | β |
| β |
ERCOT β ERCOT (Electric Reliability Council of Texas) operates the Texas grid. A large new load only gets energized once it has cleared ERCOT's interconnection process, so the label a block carries says how far along that approval is: Fully Interconnection-Approved: every ERCOT approval is granted β the load can be energized as planned. Base Load: approved as firm load in ERCOT's planning models; energization still depends on the remaining steps. Studied Load: still in ERCOT's study queue β no firm approval yet.
Bitcoin mining (1)
| Site | Active power | Est. capacityend of year, AI, IT load | Commentaries |
|---|---|---|---|
| 207 MW |
| AI/HPC lease in discussion |
*Projected AI capacity, bitcoin-mining sites excluded: the fleet online today, plus each block's remaining capacity once its scheduled delivery falls before that year end (the delivery end date; failing that the delivery start date; failing that the energization target plus one year), plus each pipeline site's planned capacity (the sum of its block targets, or its theoretical capacity when no block states one) one year after its first energization target. A bitcoin-mining site contributes only the AI capacity a block explicitly estimates for EoY 2028 β a conversion someone has assessed β counted in full, since what runs there today is mining. Past its last scheduled date, in 2027 and 2028 a site is assumed to keep adding its current in-build amount each year, up to its theoretical capacity in IT load. Blocks without a signed customer count in full (no haircut set in the common metrics).
** Estimated: the source reported this figure on a gross basis. It is shown in IT load by dividing by the PUE common metric, currently 1.3.