Barber Lake

Under construction

Colorado City, TX · USA

ColocationOwnedEncumbered — pledged as collateral
Barber Lake — Nov 2, 2026Nov 2, 2026
Active (IT load)—
In build (IT load, excl. active)207 MW
Theoretical (gross)—

Deals · Fluidstack - 09/2025 (207 MW IT)

Blocks (3)*

BlockDealCurrent / targetdelivered shareStatusSchedule**CoolingMiscEst. Capacity - EoY 2028IT loadEst. Capacity - EoY 2030IT load
Phase 1Fluidstack - 09/2025— / 168 MW IT— / 244 MW gross
Contracted
Construction start · 2025Delivery start · Dec 31, 2026Delivery end · Mar 31, 2027
————
Phase 2Fluidstack - 09/2025— / 39 MW IT— / 56 MW gross
Contracted
Delivery end · Jan 31, 2027
————
Phase 3—— / 500 MW gross
Speculative
Energization · 2030
—Potential BTM200 MW357 MW
Total— / 591.6*** MW IT— / 800 MW gross

Financings (2)

*Blocks follow a site's build-out over time; an expansion is a new block. A deal can span several blocks — picking a deal in the form prefills its remaining contracted capacity, net of what its other blocks already target. Power figures are recorded on the basis the source reported, IT load and/or gross.

**A block's capacity is taken to come online at its delivery end date (the actual date when one is recorded, otherwise the target); failing that at its delivery start date; failing that one year after its energization target. That resolved date is what the capacity estimates on the Sites & Capacity tab use.

*** Converted from the other basis with the PUE common metric (currently 1.3), because the blocks do not all state this one.