NeoCapCompaniesValuationsScenariosMetrics
← Cipher Digital · Sites

Ulysses

Cotulla, OH · USA

AI/HPC lease in discussion

No profile attributes recorded
Active (IT load)—
In build (IT load, excl. active)—
Theoretical (gross)200 MW

Blocks (1)*

BlockDealCurrent / targetdelivered shareStatusSchedule**CoolingMiscEst. Capacity - EoY 2028IT loadEst. Capacity - EoY 2030IT load
Phase 1—— / 200 MW gross
Speculative
Energization · Q4 2027
—ERCOT: Fully Interconnection-Approved——
Total— / 153.8*** MW IT— / 200 MW gross

ERCOT — ERCOT (Electric Reliability Council of Texas) operates the Texas grid. A large new load only gets energized once it has cleared ERCOT's interconnection process, so the label a block carries says how far along that approval is: Fully Interconnection-Approved: every ERCOT approval is granted — the load can be energized as planned.

*Blocks follow a site's build-out over time; an expansion is a new block. A deal can span several blocks — picking a deal in the form prefills its remaining contracted capacity, net of what its other blocks already target. Power figures are recorded on the basis the source reported, IT load and/or gross.

**A block's capacity is taken to come online at its delivery end date (the actual date when one is recorded, otherwise the target); failing that at its delivery start date; failing that one year after its energization target. That resolved date is what the capacity estimates on the Sites & Capacity tab use.

*** Converted from the other basis with the PUE common metric (currently 1.3), because the blocks do not all state this one.