← Riot Platforms · Sites

Kentucky

ActiveUnder construction

Paducah, KY · USA

Bitcoin miningOwned
Kentucky — no photo yet
Active (IT load)192 MWgross
In build (IT load, excl. active)—
Bitcoin mining (active)192 MW
Theoretical (gross)232 MW

Blocks (1)*

BlockDealCurrent / targetdelivered shareStatusSchedule**CoolingMiscEst. Capacity - EoY 2028IT loadEst. Capacity - EoY 2030IT load
Phase 1—192 MW gross
Speculative
—————
Total147.7*** MW IT192 MW gross

*Blocks follow a site's build-out over time; an expansion is a new block. A deal can span several blocks — picking a deal in the form prefills its remaining contracted capacity, net of what its other blocks already target. Power figures are recorded on the basis the source reported, IT load and/or gross.

**A block's capacity is taken to come online at its delivery end date (the actual date when one is recorded, otherwise the target); failing that at its delivery start date; failing that one year after its energization target. That resolved date is what the capacity estimates on the Sites & Capacity tab use.

*** Converted from the other basis with the PUE common metric (currently 1.3), because the blocks do not all state this one.